Skip to content

Family-run workshop · since 1984

Made-to-measure spiral and curved stairs

For spiral and curved stairs, we make the structural components from laminated timber and cut them on a five-axis CNC router. We design each staircase individually to suit your interior. You can start with a free remote design based on photos of your stairwell opening.

Made to measure

We design every staircase for your opening and interior

Free 3D design

Photos and the dimensions of the opening are all we need

CNC manufacturing

Components cut to a digital design

Installation in Poland and the EU

We deliver and install the stairs at your home

Schody Gięte jesionowe małpi ogon – zdjęcie 7

spiral and curved

How spiral and curved stairs differ

A spiral staircase winds in a circle or spiral around a central post. Curved stairs have curved components, such as stringers or handrails. Both solutions require precise cutting, so we make them on CNC machinery to a digital design.

This is a different construction from stairs with winder turns. In those stairs, wedge-shaped treads create an L or U turn. On a spiral staircase, the whole flight turns around an axis.

Schody Gięte jesionowe małpi ogon – zdjęcie 1

options

Wood, finish and optional features

We make the structural components from laminated timber. Flat surfaces and curved treads can be veneered for an additional decorative finish. We use native woods such as beech, oak and ash, as well as merbau, mahogany and American walnut. After sanding, we apply lacquer or stain the wood first. Find out more about choosing wood species and colours and see our stain colour charts.

We can add features to curved and spiral stairs, including:

  • a volute handrail and curved stringer at the bottom of the flight,
  • semi-circular treads with a constant or decreasing radius,
  • a semi-circular first riser,
  • round posts in wood or a combination of wood and acid-resistant steel,
  • glass balustrade infill,
  • openings for halogen lights.

We describe balustrade infill options on our page about stair balustrades.

Projects

Our projects

Our projects include oak stairs with a volute handrail and curved ash stairs with a handrail end that turns down. We can discuss the features shown in these projects for your stairwell opening too.

step by step

How to order spiral or curved stairs

Free remote design

Send photos of the opening from the ground and upper floors, its width and length, the total floor-to-floor height, and the thickness of the ceiling.

On-site measurement and design

This is often useful for spiral layouts. It costs PLN 200–500 net, depending on the distance.

Manufacture

We glue and machine dry timber on CNC according to the digital design, then apply lacquer or stain.

Installation

We assemble and fit the stairs, finish the opening and install the balustrade.

Lead time starts at around four weeks, depending on the stair type and materials.

FAQ

Frequently asked questions about spiral and curved stairs

How do spiral stairs differ from stairs with winder turns?

On spiral stairs, the whole flight winds in a circle or spiral around a central post. On stairs with winder turns, wedge-shaped treads create an L or U turn. Read about the latter on our page about stairs with winder turns.

Are spiral stairs comfortable?

Comfort depends on the opening dimensions, floor-to-floor height and number of treads. We design each staircase individually and check the layout in the design. This helps us establish a solution that fits your opening.

What photos and measurements do you need for a design?

We need photos of the opening from the ground and upper floors, its width and length, the total floor-to-floor height, and the thickness of the ceiling. The remote design is free.

Is an on-site measurement necessary?

Not always, but it is often useful for spiral stairs. Measurement and design cost PLN 200–500 net, depending on the distance.

How long does it take to make spiral stairs?

Lead time starts at around four weeks, depending on the stair type and materials. We will confirm the schedule after preparing the design.